CWS was fortunate to be selected as part of a design-build delivery team to complete the design of a 12,400 square foot fire-substation for the Town of Brunswick. Key features of the design included the need to utilize long lasting, low maintenance materials that met the Cook’s Corner Design Guidelines as well as to incorporate internal fire training tools. The facility accommodations paired sleep rooms, administration spaces and a conference room that can serve as an emergency response center in a crisis.