As part of an on-going relationship with a global beverage corporation, CWS became involved with the relocation of one of their program groups to a nearby 54,000 sf tenant space. The relocation included moving 175 engineers, software developers and administration staff as well as the relocation and expansion of the R&D and testing lab portions of the department. The projects intent was to incorporate better access and communication throughout the department. A great deal of time and effort was placed upon the design of the various labs assuring that the utilities within each space were properly configured to meet the needs of the engineering teams utilizing the lab. A system of unistru support walls were utilized for the utility runs allowing easy access and flexibility for future growth and alteration.
The office fit-up included a combination of open office modular furniture coordination, as well as dedicated office and meeting spaces. All conference rooms were fit-up for worldwide presentation use. A dedicated space was created for product sales and display providing a means of presenting future commercial and residential dispensing appliances.